跳到主要导航 跳到搜索 跳到主要内容

An integrated dual resource management and production planning system

  • The University of Auckland

科研成果: 书/报告/会议事项章节会议稿件同行评审

1 引用 (Scopus)

摘要

Dual resource constrained (DRC) systems are those with capacity constraints which stem from both machines and human operators. Such systems are prevalent in real-life industries and resource planning must acknowledge the unique characteristics inherent in different types of resources in order to provide optimal schedules. In particular, the inclusion and consideration of human characteristics is necessary to allow more accurate depictions of realistic situations. This paper proposes an integrated dual resource management and production planning system that is able to evaluate the combined effects of numerous worker related issues such as capability, efficiency and reliability. The resultant information can then be used to produce a set of optimised schedules accordingly. The proposed system will be module based to provide flexibility and allow easy customization to suit different industry needs.

源语言英语
主期刊名Proceedings - 2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management, IE and EM2010
728-732
页数5
DOI
出版状态已出版 - 2010
已对外发布
活动17th International Conference on Industrial Engineering and Engineering Management, IE and EM2010 - Xiamen, 中国
期限: 29 10月 201031 10月 2010

出版系列

姓名Proceedings - 2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management, IE and EM2010

会议

会议17th International Conference on Industrial Engineering and Engineering Management, IE and EM2010
国家/地区中国
Xiamen
时期29/10/1031/10/10

指纹图谱

探究 'An integrated dual resource management and production planning system' 的科研主题。它们共同构成独一无二的指纹。

引用此